PJM Interconnection
Also known as PJM, PJM Interconnection LLC
PJM Interconnection is the regional transmission organization that runs the high-voltage grid and wholesale electricity market for more than 67 million people in all or parts of 13 states and the District of Columbia.[1][2] Its 2027/2028 and 2028/2029 capacity auctions both cleared at their price caps, and the 2028/2029 auction left it 6,831 MW short of its reliability requirement, which its market monitor attributes mainly to data centre load growth.[3][4][5][6]
Key facts
PJM Interconnection runs the high-voltage grid and wholesale power market for more than 67 million people in all or parts of 13 states and Washington, DC.[1] It matters now because its capacity auctions have cleared at capped prices while data centre demand outpaces new supply.[3][4][7]
What PJM does
PJM is a regional transmission organization (RTO). It coordinates the movement of wholesale electricity across Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia.[1] Acting as what it calls a neutral, independent party, it operates a competitive wholesale electricity market, manages the high-voltage grid and plans transmission across the region, under an independent board.[2]
RTOs in general are independent, membership-based non-profits that balance supply and demand bids for wholesale power. They dispatch plants by feeding day-ahead and real-time bids from generators and load-serving entities into optimization software, and they publish prices for thousands of grid locations at intervals as short as five minutes.[8][9] For the basics of how power moves, read how the power grid works.
At the end of 2025 PJM had 184,202 MW of installed generating capacity and 1,111 members, including buyers, sellers and traders of electricity, across 21 control zones.[10] Its gross billings were $80.49 billion in 2025, up 55.7% from 2024.[11]
History
PJM began in 1927, when three utilities formed what PJM calls the world’s first continuing power pool to share generating resources.[12] That fits a wider pattern: the EIA notes that RTOs in the Northeast grew out of power pools that had coordinated utility operations for decades.[8]
In 1997 PJM became a fully independent organization. It opened membership to non-utilities, elected an independent board and launched its first bid-based energy market on 1 April 1997. Later that year FERC approved it as the first fully functioning independent system operator in the US.[13] In 2002 it became the first fully functioning RTO.[14]
Prices and the capacity market
Two of PJM’s costs get the most attention: energy and capacity. In 2025 PJM’s real-time load-weighted average energy price rose 50.4%, from $33.74 to $50.73 per MWh, and fuel and consumables costs accounted for 58.5% of the increase.[15] The total wholesale cost per MWh rose from $55.52 to $82.67. Energy made up 59.6% of it, transmission 22.4% and capacity 15.8%.[16]
The capacity market pays power plants and demand-response providers to be available years ahead, so there is enough supply on the hottest and coldest days. PJM holds an auction, called the Base Residual Auction, for each future delivery year.
Capacity prices in the Base Residual Auction are set per MW-day of unforced capacity (UCAP).[4] In coordination with the governors of its 13 states and FERC, PJM set a price cap and floor for four auctions; the 2028/2029 auction was the third under that collar.[17]
The 2027/2028 auction, announced in December 2025, cleared at the cap of $333.44 per MW-day.[3] The 2028/2029 auction, announced on 14 July 2026, cleared at its cap of $325 per MW-day, 2.5% lower, and procured 138,318 MW. Cleared supply times the price comes to $16.4 billion.[4]
Supply fell short both times. The 2028/2029 auction left committed capacity 6,831 MW below PJM’s reliability requirement, after a shortfall of about 6,500 MW the year before. PJM said these were the first auctions in its history in which the whole region fell short.[5] PJM says a shortfall does not necessarily mean it cannot serve load reliably, but that it would operate with slimmer reserves and more risk.[18]
The data centre question
PJM said nearly 5,100 MW of a roughly 5,250 MW rise in forecast peak load for 2027/2028 came from data centres.[7] Its independent market monitor, Monitoring Analytics, went further. It said data centre load growth is the primary reason for recent capacity market conditions, and it judged the results of the 2025/2026, 2026/2027 and 2027/2028 capacity auctions not competitive.[6] In July 2026 about 3,800 MW of data centre load tripped offline in northern Virginia after a line fault, which PJM called the largest such event in its history.[19]
PJM’s response includes a planned reliability backstop procurement for near-term needs. It also plans “connect and manage” rules that would let large new loads such as data centres connect but operate flexibly when needed.[20] The AI data centre power tracker follows these filings.
What it means for bills
PJM stresses that capacity is a fraction of wholesale costs and that wholesale costs are only part of a retail bill.[21] Still, the EIA’s October 2026 outlook forecast 2026 wholesale electricity prices in PJM 41% above 2025, the largest rise of any region it tracks.[22] The electricity prices explainer covers what else goes into a bill.
PJM’s main site could not be reached from our tools, so its “Who we are”, history and July 2026 auction pages were read through Internet Archive copies. For Texas, which runs its own separate grid, read the ERCOT page.
Read next
ERCOT (Electric Reliability Council of Texas)
ERCOT runs the Texas power grid for 27 million customers. Why it stands apart from other US grids, its fuel mix, the 2021 freeze and the data centre queue.
Questions readers ask
What is PJM Interconnection?
PJM is a regional transmission organization. It coordinates the movement of wholesale electricity in all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia, serving more than 67 million people. It runs the wholesale market and manages the high-voltage grid but describes itself as a neutral, independent party.[1][2]
Who takes part in PJM's market?
PJM operates a competitive wholesale electricity market and manages the high-voltage grid. Its 1,111 members at the end of 2025 included market buyers, sellers and traders of electricity.[2][10]
What happened in PJM's latest capacity auction?
The 2028/2029 auction, announced on 14 July 2026, cleared at the FERC-approved cap of $325 per MW-day and procured 138,318 MW. Total committed capacity was 6,831 MW short of PJM's reliability requirement.[4][5]
Why are PJM capacity prices so high?
PJM's independent market monitor says data centre load growth is the primary reason for recent capacity market conditions, including tight supply and high prices. PJM itself said nearly 5,100 MW of a roughly 5,250 MW rise in forecast peak load for 2027/2028 came from data centres.[6][7]
Sources
· 22 claims from 6 publishers
Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.
- [1]
PJM Interconnection is a regional transmission organization that coordinates the movement of wholesale electricity in all or parts of 13 states and the District of Columbia, serving more than 67 million people. confirmedas of 2026-11-07
- Who We Are (archived 24 October 2026) · PJM Interconnection · Primary source (retrieved 2026-11-07)
- Who We Are (archived 24 October 2026) · PJM Interconnection · Primary source (retrieved 2026-11-07)
- Who We Are (archived 24 October 2026) · PJM Interconnection · Primary source (retrieved 2026-11-07)
- [2]
PJM describes itself as a neutral, independent party that operates a competitive wholesale electricity market, manages the high-voltage grid and runs long-term regional transmission planning, overseen by an independent board. confirmedas of 2026-11-07
- Who We Are (archived 24 October 2026) · PJM Interconnection · Primary source (retrieved 2026-11-07)
- Who We Are (archived 24 October 2026) · PJM Interconnection · Primary source (retrieved 2026-11-07)
- Who We Are (archived 24 October 2026) · PJM Interconnection · Primary source (retrieved 2026-11-07)
- [3]
PJM's 2027/2028 capacity auction, announced on 17 December 2025, cleared at the FERC-approved cap of $333.44 per MW-day across its footprint, up 1.3% from the 2026/2027 auction; cleared supply times the price totals $16.4 billion, though not all load pays that price. PJM serves more than 67 million people in 13 states and the District of Columbia. confirmedas of 2025-12-17
- PJM Auction Procures 134,479 MW of Generation Resources · PJM Interconnection · Primary source · 2025-12-17 · Auction results (retrieved 2026-11-07)
- PJM Auction Procures 134,479 MW of Generation Resources · PJM Interconnection · Primary source · 2025-12-17 · Auction results (retrieved 2026-11-07)
- PJM Auction Procures 134,479 MW of Generation Resources · PJM Interconnection · Primary source · 2025-12-17 · Opening paragraph (retrieved 2026-11-07)
- [4]
PJM's 2028/2029 capacity auction, announced on 14 July 2026, cleared at the FERC-approved cap of $325 per MW-day across its footprint, 2.5% below the 2027/2028 cap of $333.44, procuring 138,318 MW of capacity; cleared supply times price totals $16.4 billion. confirmedas of 2026-07-14
- PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand · PJM Interconnection · Primary source · 2026-07-14 · Page 1 (retrieved 2026-11-07)
- PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand · PJM Interconnection · Primary source · 2026-07-14 · Page 1 (retrieved 2026-11-07)
- PJM capacity auction procures 138,318 MW of generation resources; capacity price comes in at cap of $325 · American Public Power Association · Secondary source · 2026-07-14 · Headline (retrieved 2026-11-07)
- [5]
The 2028/2029 auction left committed capacity 6,831 MW short of PJM's reliability requirement, after a shortfall of about 6,500 MW in the previous auction; PJM said these were the first auctions in its history in which the whole region fell short. confirmedas of 2026-07-14
- PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand · PJM Interconnection · Primary source · 2026-07-14 · Page 1 (retrieved 2026-11-07)
- PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand · PJM Interconnection · Primary source · 2026-07-14 · Page 1 (retrieved 2026-11-07)
- PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand · PJM Interconnection · Primary source · 2026-07-14 (retrieved 2026-11-07)
- [6]
PJM's independent market monitor, Monitoring Analytics, said data centre load growth is the primary reason for recent capacity market conditions, including the tight supply and high prices, and found the 2025/2026, 2026/2027 and 2027/2028 capacity market results were not competitive. confirmedas of 2026-03-12
- 2025 State of the Market Report for PJM, Section 1: Introduction · Monitoring Analytics (Independent Market Monitor for PJM) · Primary source · 2026-03-12 · Section 1, 2025 in Review (p. 1) (retrieved 2026-11-07)
- 2025 State of the Market Report for PJM, Section 1: Introduction · Monitoring Analytics (Independent Market Monitor for PJM) · Primary source · 2026-03-12 · Section 1, 2025 in Review (p. 1) (retrieved 2026-11-07)
- [7]
PJM said the forecast peak load for its 2027/2028 delivery year was about 5,250 MW higher than for the previous auction and that nearly 5,100 MW of the increase was attributable to data centre demand; a PJM executive said the auction showed data centres' demand "continues to far outstrip new supply". confirmedas of 2025-12-17
- PJM Auction Procures 134,479 MW of Generation Resources · PJM Interconnection · Primary source · 2025-12-17 · Load forecast (retrieved 2026-11-07)
- PJM capacity auction hits price cap again as region falls short of reliability target · Power Engineering · Secondary source · 2025-12-18 · Article body (retrieved 2026-11-07)
- PJM Auction Procures 134,479 MW of Generation Resources · PJM Interconnection · Primary source · 2025-12-17 · Quote from Stu Bresler, Executive Vice President (retrieved 2026-11-07)
- [8]
Regional transmission organizations are independent, membership-based non-profits that run bulk power systems and wholesale markets; they developed in the 1990s under FERC's open-access policy, and in the Northeast they evolved from long-standing power pools. confirmedas of 2026-11-07
- About 60% of the U.S. electric power supply is managed by RTOs · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- About 60% of the U.S. electric power supply is managed by RTOs · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- About 60% of the U.S. electric power supply is managed by RTOs · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- [9]
RTOs dispatch power by feeding day-ahead and real-time bids from generators and load-serving entities into optimization software, and they publish prices for thousands of locations at intervals as short as five minutes. confirmedas of 2026-11-07
- About 60% of the U.S. electric power supply is managed by RTOs · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- About 60% of the U.S. electric power supply is managed by RTOs · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- [10]
At the end of 2025 PJM had 184,202 MW of installed generating capacity and 1,111 members across 21 control zones, according to its independent market monitor. confirmedas of 2025-12-31
- 2025 State of the Market Report for PJM, Section 1: Introduction · Monitoring Analytics (Independent Market Monitor for PJM) · Primary source · 2026-03-12 · Section 1, PJM Market Background (p. 5) (retrieved 2026-11-07)
- [11]
PJM's gross billings were $80.49 billion in 2025, up 55.7% from $51.71 billion in 2024. confirmedas of 2025-12-31
- 2025 State of the Market Report for PJM, Section 1: Introduction · Monitoring Analytics (Independent Market Monitor for PJM) · Primary source · 2026-03-12 · Section 1, Figure 1-2 caption text (p. 6) (retrieved 2026-11-07)
- [12]
PJM began in 1927, when three utilities formed what PJM calls the world's first continuing power pool to share their generating resources. confirmedas of 2026-11-07
- PJM History (archived 2 October 2026) · PJM Interconnection · Primary source · PJM History, first paragraph (retrieved 2026-11-07)
- [13]
PJM became a fully independent organization in 1997, opening membership to non-utilities, launching its first bid-based energy market on 1 April 1997 and winning FERC approval that year as the first fully functioning independent system operator. confirmedas of 2026-11-07
- PJM History (archived 2 October 2026) · PJM Interconnection · Primary source (retrieved 2026-11-07)
- PJM History (archived 2 October 2026) · PJM Interconnection · Primary source (retrieved 2026-11-07)
- [14]
PJM became the first fully functioning regional transmission organization in the US in 2002. confirmedas of 2026-11-07
- PJM History (archived 2 October 2026) · PJM Interconnection · Primary source · PJM History: 'PJM became the nation's first fully functioning RTO in 2002.' (retrieved 2026-11-07)
- [15]
PJM's real-time load-weighted average wholesale energy price rose 50.4% in 2025, from $33.74 to $50.73 per MWh, with fuel and consumables costs accounting for 58.5% of the increase. confirmedas of 2025-12-31
- 2025 State of the Market Report for PJM, Section 1: Introduction · Monitoring Analytics (Independent Market Monitor for PJM) · Primary source · 2026-03-12 · Section 1, 2025 in Review (p. 4) (retrieved 2026-11-07)
- 2025 State of the Market Report for PJM, Section 1: Introduction · Monitoring Analytics (Independent Market Monitor for PJM) · Primary source · 2026-03-12 · Section 1, 2025 in Review (p. 4) (retrieved 2026-11-07)
- [16]
In 2025 energy (59.6%), transmission (22.4%) and capacity (15.8%) made up 97.9% of the total cost of wholesale power in PJM, which rose from $55.52 to $82.67 per MWh. confirmedas of 2025-12-31
- 2025 State of the Market Report for PJM, Section 1: Introduction · Monitoring Analytics (Independent Market Monitor for PJM) · Primary source · 2026-03-12 · Section 1, 2025 in Review (p. 4) (retrieved 2026-11-07)
- 2025 State of the Market Report for PJM, Section 1: Introduction · Monitoring Analytics (Independent Market Monitor for PJM) · Primary source · 2026-03-12 · Section 1, 2025 in Review (pp. 4-5) (retrieved 2026-11-07)
- [17]
PJM, in coordination with the governors of its 13 states and FERC, set a price cap and floor for four capacity auctions; the 2028/2029 auction was the third held under the collar. confirmedas of 2026-07-14
- PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand · PJM Interconnection · Primary source · 2026-07-14 · Page 1 (retrieved 2026-11-07)
- PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand · PJM Interconnection · Primary source · 2026-07-14 · Page 1 (retrieved 2026-11-07)
- [18]
PJM said a capacity shortfall does not necessarily mean it cannot serve load reliably, but that it would operate with slimmer reserves and more risk; it holds a 14.7% reserve margin for the 2028/2029 delivery year. confirmedas of 2026-07-14
- PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand · PJM Interconnection · Primary source · 2026-07-14 · Page 2 (retrieved 2026-11-07)
- [19]
About 3,800 MW of data centre load tripped offline in northern Virginia on July 22, 2026 after a fault on a 230-kV line, the largest such event in PJM's history, according to the grid operator. reportedas of 2026-08-12
- Trendline: Data Centers and the US Grid · Utility Dive · Secondary source · Article: PJM eyes data center, crypto reliability requirements (Aug. 12, 2026) (retrieved 2026-11-07)
- [20]
After the 2028/2029 auction PJM said it planned a reliability backstop procurement for near-term needs and "connect and manage" rules letting large new loads such as data centres connect but operate flexibly when needed. confirmedas of 2026-07-14
- PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand · PJM Interconnection · Primary source · 2026-07-14 · Page 2 (retrieved 2026-11-07)
- PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand · PJM Interconnection · Primary source · 2026-07-14 · Page 2 (retrieved 2026-11-07)
- [22]
In its October 2026 Short-Term Energy Outlook, the EIA forecast 2026 wholesale electricity prices in the PJM region 41% higher than in 2025, the largest increase of any region it tracks. confirmedas of 2026-10-06· forecast
- Short-Term Energy Outlook, October 2026 - Electricity, coal, and renewables · US Energy Information Administration · Primary source · 2026-10-06 · Electricity prices and consumption (retrieved 2026-11-07)
Revision history (1)
- Page created.
Created Nov 7, 2026. Last reviewed by an editor on Nov 8, 2026. Next scheduled review: Feb 7, 2027.
Cite this page
"PJM Interconnection." ContentLora, updated Nov 7, 2026. https://contentlora.com/wiki/pjm-interconnection
Spotted an error? Suggest a correction or emailcorrections@contentlora.com.