Explainer
Geothermal energy explained: conventional and enhanced systems
Geothermal energy is heat from inside the Earth, which power plants tap by drilling into hot water or steam reservoirs.[1][2] It supplies less than 1% of global energy and about 0.4% of US utility-scale electricity, but the US Department of Energy says enhanced geothermal systems, which create reservoirs in hot rock that lacks natural fluid or permeability, could extend it beyond traditional hydrothermal regions.[3][4][5][6] In September 2026 Fervo Energy's Cape Station in Utah became, by the company's account, the first greenfield enhanced geothermal development to reach contractual commercial operation.[7]
This explainer covers how geothermal electricity is made, the difference between conventional and enhanced systems, the projects and policy behind the 2026 push, and the main capacity and cost estimates. Company figures are self-reported and labelled as such. For how geothermal fits into the wider electricity system, read the power grid explainer next.
Where geothermal heat comes from
Geothermal energy is heat stored inside the Earth, and it counts as renewable because the planet keeps producing it.[1] Most of that heat comes from the slow breakdown of radioactive particles, and rock and water get hotter the deeper you drill.[8] The easiest places to use it are near the edges of tectonic plates, where most volcanoes are also found.[9]
The EIA attributes the Earth’s internal heat mainly to radioactive decay, with temperature rising with depth.[8] Commercially attractive high-temperature resources cluster along plate boundaries, which is why existing geothermal power is concentrated in a few countries, including the United States, Iceland, Indonesia, Türkiye, Kenya and Italy.[9][3]
Geothermal heat is also used directly: hot water near the surface heats most of the buildings in Reykjavik through a district heating system, and geothermal heat pumps use stable shallow ground temperatures to heat and cool individual buildings.[10]
How a conventional geothermal power plant works
Conventional plants tap hydrothermal resources, underground areas that hold both water and heat. They need water or steam at roughly 300 °F to 700 °F, reached by wells that can be as much as 2 miles deep.[2]
There are three main designs. Dry steam plants pipe steam straight from the ground to a turbine; the first geothermal power plant, in Italy in 1904, worked this way. Flash steam plants, the most common, let high-pressure hot water turn to steam at the surface. Binary-cycle plants use the hot water to boil a second liquid, so the underground water never touches the turbine.[11]
Dry steam, flash and binary-cycle plants differ in how reservoir fluid reaches the turbine. Binary-cycle plants keep the geothermal brine in a closed loop and transfer its heat to a lower-boiling working fluid, which lets them use cooler resources.[11]
In 2025, US geothermal plants operated in seven states and produced about 16 billion kilowatthours, about 0.4% of US utility-scale electricity.[4] California leads, and The Geysers in Northern California, the world’s largest known dry steam field, has produced power since 1960.[12] Worldwide, 25 countries generated about 92 billion kilowatthours in 2022; Indonesia produced the most, and Kenya got about 43% of its electricity from geothermal.[13]
Because the heat source is continuous, geothermal plants can run day and night. The IEA puts the 2023 average utilisation of global geothermal capacity above 75%, compared with under 30% for wind and under 15% for solar PV.[14] For how round-the-clock sources fit into rising electricity demand, see AI data centres and power and how nuclear fission reactors work.
Enhanced and next-generation geothermal
A natural hydrothermal system needs three things: heat, fluid and permeability, meaning channels through which fluid can flow. In many places the rock is hot but lacks the other two.[5]
An enhanced geothermal system (EGS) builds the missing reservoir. Operators pump fluid deep underground under careful control to open cracks in the hot rock, circulate water through those cracks to heat it, and bring it back up to make electricity.[5] The US Department of Energy says this could let geothermal spread beyond the regions where it is used today.[6]
EGS stimulates hot, low-permeability rock by injecting fluid under controlled conditions to create new fractures and reopen existing ones, establishing a circulation loop between injection and production wells.[5] The IEA says horizontal drilling and hydraulic fracturing, refined in North American oil and gas, are among the techniques opening these resources, and that up to 80% of a geothermal project’s investment involves skills common in that industry.[15] Drilling is a large share of the cost: DOE estimates that well casing and cementing alone account for around 30% to 40% or more of well costs.[16]
DOE also lists two other next-generation approaches: closed-loop systems, which circulate fluid through sealed underground pipes without relying on fractures, and superhot systems, which tap rock above 375 °C where water takes on properties of both a liquid and a gas.[17]
Fervo and other projects
Fervo Energy’s EGS pilot in Nevada, Project Red, has supplied 3 MW of gross power to the grid since 2023, according to the company.[18] The company says its larger Cape Station in Beaver County, Utah, synchronised its first 33 MW block to the grid on 24 September 2026 and declared commercial operation on 30 September; Fervo calls it the world’s first greenfield enhanced geothermal development to reach commercial operation.[7] Fervo says the first phase is about 100 MW in three blocks, with the remaining two expected online by 1 January 2027, and that a further 400 MW phase is under construction for 2028.[19] On 1 September 2026 the company announced a 396 MW power purchase agreement with Google linked to that expansion.[20]
DOE’s FORGE initiative is a dedicated field site for testing EGS techniques, and DOE funds pilot demonstrations in different geologic settings.[21] Fervo says Cape Station drew on DOE’s EGS Pilot Demonstrations programme, and in September 2026 it announced two further DOE awards totalling about $20 million for work in Idaho and Nevada.[22]
Policy support and outlook
In its FY 2027 budget request, the Department of Energy moves geothermal into a new Hydrocarbons and Geothermal Energy Office, the renamed Office of Fossil Energy; in FY 2025 and FY 2026 it was funded through the renewable energy office.[23] The same request proposes $3.5 billion for a baseload power initiative that includes new geothermal capacity alongside coal, gas, nuclear, hydropower and transmission upgrades.[24]
The IEA‘s 2024 report on the future of geothermal energy sets out the long-run case. It estimates that, with continued cost reductions, geothermal could meet up to 15% of global electricity demand growth to 2050, or as much as 800 GW of capacity.[25] It also projects that next-generation geothermal costs could fall by 80% by 2035, to around USD 50 per megawatt-hour, with the right support.[26] The agency names the obstacles too: permitting can stretch a new project to up to a decade, and fewer than 30 countries have geothermal policies, against more than 100 with policies for solar PV or onshore wind.[27]
Read next: the power grid explainer for how firm and variable sources are balanced, and the fusion energy crash course for another firm power technology that is still at the demonstration stage.
See how the power grid works and fusion energy.
Read next
US Department of Energy (DOE)
The US Department of Energy runs 17 national labs, the nuclear weapons stockpile, energy loans and the Genesis AI mission. Its role and FY 2027 budget.
More in Energy and climate
Questions readers ask
Is geothermal energy renewable?
Yes. The US Energy Information Administration calls it renewable because the Earth constantly produces the heat, which comes mainly from the slow breakdown of radioactive particles.[1][8]
How much electricity does geothermal produce in the US?
In 2025, geothermal plants in seven states produced about 16 billion kilowatthours, about 0.4% of US utility-scale generation. California generates the most.[4][12]
What is an enhanced geothermal system?
It is a human-made reservoir. Where rock is hot but lacks enough fluid or permeability, operators inject fluid under controlled conditions to open new and existing fractures, then circulate water through the hot rock and bring it back up to make electricity.[5]
Why is geothermal described as "firm" power?
Because the heat is continuous, plants can run around the clock. The IEA says global geothermal capacity ran at an average utilisation rate above 75% in 2023, against under 30% for wind and under 15% for solar PV.[14]
Which country uses the most geothermal electricity?
In 2022 Indonesia produced the most geothermal electricity, while Kenya had the largest share of its generation from geothermal, about 43%.[13]
Is Fervo's Cape Station operating?
Fervo says the first 33 MW block at Cape Station in Utah declared commercial operation on 30 September 2026, with the rest of the roughly 100 MW first phase expected by 1 January 2027. These are company-reported figures.[7][19]
How cheap could geothermal get?
The IEA estimates that, with the right support, next-generation geothermal costs could fall by 80% by 2035 to around USD 50 per megawatt-hour. That is a projection, not a current price.[26]
Sources
· 27 claims from 5 publishers
Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.
- [1]
The US Energy Information Administration describes geothermal energy as heat inside the Earth, and calls it renewable because the Earth constantly produces this heat. confirmedas of 2026-11-07
- Geothermal explained · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- Geothermal explained · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- [2]
Conventional geothermal power plants tap hydrothermal resources, underground areas with both water and heat, and need very hot water or steam of about 300 °F to 700 °F from wells that can be as much as 2 miles deep. confirmedas of 2026-11-07
- Geothermal explained: Geothermal power plants · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- Geothermal explained: Geothermal power plants · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- Geothermal explained: Geothermal power plants · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- [4]
In 2025, US geothermal power plants operated in seven states and produced about 16 billion kilowatthours, about 0.4% of US utility-scale electricity generation. confirmedas of 2026-11-07
- Geothermal explained: Use of geothermal energy · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- [5]
The US Department of Energy says a natural hydrothermal system needs heat, fluid and permeability; where rock is hot but lacks fluid or permeability, an enhanced geothermal system (EGS) injects fluid under controlled conditions to open new and existing fractures and create a reservoir. confirmedas of 2026-11-07
- Enhanced Geothermal Systems · US Department of Energy, Office of Geothermal · Primary source (retrieved 2026-11-07)
- Enhanced Geothermal Systems · US Department of Energy, Office of Geothermal · Primary source (retrieved 2026-11-07)
- [6]
DOE says EGS and other next-generation technologies could extend geothermal production beyond traditional hydrothermal regions. confirmedas of 2026-11-07
- Enhanced Geothermal Systems · US Department of Energy, Office of Geothermal · Primary source (retrieved 2026-11-07)
- [7]
Fervo Energy said its first 33 MW power block at Cape Station in Beaver County, Utah, synchronised to the grid on 24 September 2026 and declared commercial operation on 30 September, which the company called a world first for a greenfield enhanced geothermal development (company-reported). confirmedas of 2026-10-01
- Fervo Energy Declares Commercial Operation at Cape Station Ahead of Schedule · Fervo Energy · Primary source · 2026-10-01 (retrieved 2026-11-07)
- Fervo Energy Declares Commercial Operation at Cape Station Ahead of Schedule · Fervo Energy · Primary source · 2026-10-01 (retrieved 2026-11-07)
- Fervo Energy Declares Commercial Operation at Cape Station Ahead of Schedule · Fervo Energy · Primary source · 2026-10-01 (retrieved 2026-11-07)
- [8]
According to the EIA, the Earth's internal heat comes from the slow breakdown of radioactive particles, and rocks and water get hotter the deeper you go. confirmedas of 2026-11-07
- Geothermal explained · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- Geothermal explained · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- [9]
The EIA says most major geothermal resources lie near the edges of the Earth's tectonic plates, where most volcanoes are also found. confirmedas of 2026-11-07
- Geothermal explained: Where geothermal energy is found · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- [10]
Besides electricity, geothermal heat is used directly for bathing, building and district heating, as in Reykjavik, Iceland, while geothermal heat pumps use near-surface ground temperatures to heat and cool buildings. confirmedas of 2026-11-07
- Geothermal explained: Use of geothermal energy · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- Geothermal explained: Use of geothermal energy · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- [11]
The EIA describes three kinds of geothermal power plant. Dry steam plants use reservoir steam directly, as the first geothermal plant did in Italy in 1904; flash steam plants, the most common type, use high-pressure hot water; and binary-cycle plants pass the heat to a second liquid, so the geothermal water never touches the turbine. confirmedas of 2026-11-07
- Geothermal explained: Geothermal power plants · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- Geothermal explained: Geothermal power plants · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- Geothermal explained: Geothermal power plants · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- [12]
California leads the US in geothermal electricity generation, and The Geysers in Northern California, the largest known dry steam field in the world, has produced electricity since 1960. confirmedas of 2026-11-07
- Geothermal explained: Where geothermal energy is found · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- [13]
In 2022, 25 countries generated about 92 billion kilowatthours of geothermal electricity; Indonesia produced the most, and Kenya had the largest geothermal share of its generation, about 43%. confirmedas of 2026-11-07
- Geothermal explained: Use of geothermal energy · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- Geothermal explained: Use of geothermal energy · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- Geothermal explained: Use of geothermal energy · US Energy Information Administration · Primary source (retrieved 2026-11-07)
- [14]
According to the IEA, global geothermal capacity ran at an average utilisation rate above 75% in 2023, compared with under 30% for wind and under 15% for solar PV. confirmedas of 2026-11-07
- The Future of Geothermal Energy: Executive summary · International Energy Agency · Primary source (retrieved 2026-11-07)
- [15]
The IEA says horizontal drilling and hydraulic fracturing, refined in North American oil and gas, are among the advances opening new prospects for geothermal, and that up to 80% of a geothermal project's investment involves skills common in the oil and gas industry. confirmedas of 2026-11-07
- The Future of Geothermal Energy: Executive summary · International Energy Agency · Primary source (retrieved 2026-11-07)
- The Future of Geothermal Energy: Executive summary · International Energy Agency · Primary source (retrieved 2026-11-07)
- [16]
DOE says well casing and cementing make up around 30% to 40% or more of overall geothermal well costs. confirmedas of 2026-11-07
- Enhanced Geothermal Systems · US Department of Energy, Office of Geothermal · Primary source (retrieved 2026-11-07)
- [17]
DOE lists closed-loop systems, which circulate fluid through sealed underground pipes without a fracture network, and superhot systems, which tap rock above 375 °C, as other next-generation geothermal technologies. confirmedas of 2026-11-07
- Enhanced Geothermal Systems · US Department of Energy, Office of Geothermal · Primary source (retrieved 2026-11-07)
- Enhanced Geothermal Systems · US Department of Energy, Office of Geothermal · Primary source · Same paragraph, preceding sentence: superhot systems tap resources at more than 375°C (the > sign is HTML-encoded in the cached text) (retrieved 2026-11-07)
- [18]
Fervo's EGS pilot in Nevada, Project Red, has supplied 3 MW of gross power to the Nevada grid since 2023, according to the company. confirmedas of 2026-09-22
- Fervo Energy Secures Two U.S. Department of Energy Awards to Develop Next-Generation Geothermal in Idaho and Nevada · Fervo Energy · Primary source · 2026-09-22 (retrieved 2026-11-07)
- [19]
Fervo says Cape Station's first phase is about 100 MW in three 33 MW blocks, with the other two expected to reach commercial operation by 1 January 2027, and that a further 400 MW phase is under construction for 2028. confirmedas of 2026-10-01· forecast
- Fervo Energy Declares Commercial Operation at Cape Station Ahead of Schedule · Fervo Energy · Primary source · 2026-10-01 (retrieved 2026-11-07)
- Fervo Energy Declares Commercial Operation at Cape Station Ahead of Schedule · Fervo Energy · Primary source · 2026-10-01 (retrieved 2026-11-07)
- Fervo Energy Declares Commercial Operation at Cape Station Ahead of Schedule · Fervo Energy · Primary source · 2026-10-01 (retrieved 2026-11-07)
- [20]
On 1 September 2026 Fervo announced a 396 MW power purchase agreement with Google tied to the expansion of Cape Station, expected to come online in 2028. confirmedas of 2026-09-01
- Fervo Energy and Google sign 396 MW PPA · Fervo Energy · Primary source · 2026-09-01 (retrieved 2026-11-07)
- [21]
DOE's FORGE initiative is a dedicated field site for developing and testing EGS techniques, and DOE also funds EGS pilot demonstrations in different geologic settings. confirmedas of 2026-11-07
- Enhanced Geothermal Systems · US Department of Energy, Office of Geothermal · Primary source (retrieved 2026-11-07)
- Enhanced Geothermal Systems · US Department of Energy, Office of Geothermal · Primary source (retrieved 2026-11-07)
- [22]
In September 2026 Fervo said it had received two DOE awards totalling about $20 million for EGS work in Idaho, with several national labs, and Nevada, after earlier DOE EGS Pilot Demonstrations funding for Cape Station. confirmedas of 2026-09-22
- Fervo Energy Secures Two U.S. Department of Energy Awards to Develop Next-Generation Geothermal in Idaho and Nevada · Fervo Energy · Primary source · 2026-09-22 (retrieved 2026-11-07)
- Fervo Energy Secures Two U.S. Department of Energy Awards to Develop Next-Generation Geothermal in Idaho and Nevada · Fervo Energy · Primary source · 2026-09-22 (retrieved 2026-11-07)
- Fervo Energy Secures Two U.S. Department of Energy Awards to Develop Next-Generation Geothermal in Idaho and Nevada · Fervo Energy · Primary source · 2026-09-22 (retrieved 2026-11-07)
- [23]
In DOE's FY 2027 budget request, geothermal sits in the Hydrocarbons and Geothermal Energy Office (formerly the Office of Fossil Energy); in FY 2025 and FY 2026 geothermal was funded through the Office of Energy Efficiency and Renewable Energy. confirmedas of 2026-11-07
- Department of Energy FY 2027 Budget in Brief · US Department of Energy · Primary source · Budget in Brief, p. 2 (retrieved 2026-11-07)
- Department of Energy FY 2027 Budget in Brief · US Department of Energy · Primary source · HGEO section, table footnote 1 (retrieved 2026-11-07)
- [24]
DOE's FY 2027 request includes $3.5 billion for a baseload power initiative that covers coal, gas and nuclear upgrades, transmission reconductoring, hydropower uprates and new geothermal capacity. confirmedas of 2026-11-07
- Department of Energy FY 2027 Budget in Brief · US Department of Energy · Primary source (retrieved 2026-11-07)
- Department of Energy FY 2027 Budget in Brief · US Department of Energy · Primary source (retrieved 2026-11-07)
- Department of Energy FY 2027 Budget in Brief · US Department of Energy · Primary source (retrieved 2026-11-07)
- [25]
The IEA estimates that, with continued cost reductions, geothermal could meet up to 15% of global electricity demand growth to 2050, which would mean as much as 800 GW of capacity worldwide. confirmedas of 2026-11-07· forecast
- The Future of Geothermal Energy: Executive summary · International Energy Agency · Primary source (retrieved 2026-11-07)
- The Future of Geothermal Energy: Executive summary · International Energy Agency · Primary source (retrieved 2026-11-07)
- [26]
The IEA estimates that, with the right support, the cost of next-generation geothermal could fall by 80% by 2035, to around USD 50 per megawatt-hour. confirmedas of 2026-11-07· forecast
- The Future of Geothermal Energy: Executive summary · International Energy Agency · Primary source (retrieved 2026-11-07)
- The Future of Geothermal Energy: Executive summary · International Energy Agency · Primary source (retrieved 2026-11-07)
- [27]
The IEA says permitting can stretch commissioning a new geothermal project to up to a decade, and that fewer than 30 countries have geothermal policies, against more than 100 with policies for solar PV or onshore wind. confirmedas of 2026-11-07
- The Future of Geothermal Energy: Executive summary · International Energy Agency · Primary source (retrieved 2026-11-07)
- The Future of Geothermal Energy: Executive summary · International Energy Agency · Primary source (retrieved 2026-11-07)
Revision history (2)
- Attributed the Cape Station grid-connection dates to Fervo.
- Page created.
Created Nov 7, 2026. Last reviewed by an editor on Nov 8, 2026. Next scheduled review: Feb 7, 2027.
Cite this page
"Geothermal energy explained: conventional and enhanced systems." ContentLora, updated Nov 14, 2026. https://contentlora.com/explain/geothermal-energy-explained
Spotted an error? Suggest a correction or emailcorrections@contentlora.com.