Skip to content
ContentLora

    Tip: press / anywhere to search.

    Explainer

    NASA's commercial Moon landers (CLPS) explained

    Through Commercial Lunar Payload Services (CLPS), NASA buys rides to the Moon for its instruments from American companies instead of building its own landers.[1] NASA says it has awarded 17 deliveries to five companies, under contracts worth up to $2.6 billion combined through November 2028.[2] Results so far are mixed: Intuitive Machines landed in February 2024 and Firefly's Blue Ghost landed upright in March 2025, while Astrobotic's Peregrine never reached the surface and IM-2 ended up on its side.[3][4][5][6]

    Editor reviewedUpdated Explainer16 claims · 100% primarySpace exploration and astronomy, Astronomy and sky

    How CLPS works

    Through CLPS, NASA works with American companies to deliver its scientific, exploration and technology payloads to the Moon’s surface and orbit.[1] Each award covers the whole delivery, including payload integration, mission operations, launch from Earth and landing.[7] NASA announced its first nine CLPS companies on November 29, 2018, and added five more, including Blue Origin, on November 18, 2019.[8]

    NASA’s CLPS page says 13 companies are now eligible for work. It has awarded 17 lunar deliveries to five vendors, carrying more than 60 payloads. The contracts are indefinite-delivery, indefinite-quantity awards with a combined maximum value of $2.6 billion through November 2028.[2]

    NASA says it accepted that the commercial approach could produce some failures.[9]

    The landings so far

    • Peregrine (Astrobotic): launched on January 8, 2024, with five NASA payloads, the first CLPS mission to launch. It did not land, and re-entered over the South Pacific on January 18.[5]
    • IM-1 (Intuitive Machines): the Nova-C lander launched on February 15, 2024, with six NASA payloads and landed on February 22 near Malapert A.[3]
    • Blue Ghost Mission 1 (Firefly Aerospace): landed upright at 3:34 a.m. EST on March 2, 2025, near Mons Latreille in Mare Crisium, carrying 10 NASA instruments. It was Firefly’s first Moon landing.[4]
    • IM-2 (Intuitive Machines): touched down on March 6, 2025, more than 400 metres from its Mons Mouton target and closer to the lunar south pole than any lander before it. It ended up on its side, so its NASA drill and instruments could not fully operate.[6]

    What is planned next

    In August 2026 NASA said Blue Origin, Firefly Aerospace, Intuitive Machines and Voyager were working toward delivering landers by 2028. It said the first phase of its Moon Base plan, running through 2029, includes more than twenty robotic landings.[10]

    • Griffin-1 (Voyager Technologies): planned to launch in late 2026, with five NASA payloads on Astrolab’s FLIP rover.[11]
    • Blue Ghost Mission 2 (Firefly): planned as the first American landing on the Moon’s far side, with three NASA payloads.[12]
    • IM-3 (Intuitive Machines): its third Nova-C landing, carrying five NASA payloads to Reiner Gamma, a lunar swirl, alongside the Altus-1 relay satellite.[13]
    • Blue Moon Mark 1 (Blue Origin): the first lander, named Endurance, had finished environmental testing and was in integrated testing.[14] It is to carry two NASA payloads to the lunar south pole under task order CT-3.[15]

    The VIPER rescue

    NASA had cancelled its VIPER rover. On September 19, 2025, it gave Blue Origin a CLPS task order, CS-7, worth up to $190 million. The order includes an option to land VIPER near the lunar south pole in late 2027 on a second Blue Moon Mark 1 lander.[16]

    Blue Origin

    Blue Origin builds the New Glenn rocket and Blue Moon landers. Its NASA work covers Artemis lunar landers, CLPS deliveries and the 2025 ESCAPADE launch.

    More in Space exploration

    Developing in Science & Energy

    Go deeper

    Questions readers ask

    What is CLPS?

    Commercial Lunar Payload Services is a NASA initiative that pays American companies to deliver NASA science, exploration and technology payloads to the Moon's surface and orbit. Each award covers the whole job, from payload integration and launch to landing.[1][7]

    How many companies and missions are involved?

    NASA says 13 companies are eligible for CLPS work, and it has awarded 17 lunar deliveries to five of them, carrying more than 60 payloads. The contracts have a combined maximum value of $2.6 billion through November 2028.[2]

    Which CLPS landers have reached the Moon?

    Intuitive Machines' Nova-C landed on February 22, 2024. Firefly's Blue Ghost Mission 1 landed upright on March 2, 2025. Intuitive Machines' IM-2 touched down on March 6, 2025, but ended up on its side. Astrobotic's Peregrine, launched in January 2024, did not land.[3][4][6][5]

    Why does NASA accept failures?

    NASA says it accepted that the commercial approach could produce some failures.[9]

    Which CLPS missions come next?

    As of August 2026, NASA listed Voyager's Griffin-1 (planned launch late 2026), Firefly's Blue Ghost Mission 2 to the far side, Intuitive Machines' IM-3 to Reiner Gamma and Blue Origin's first Blue Moon Mark 1 lander among the next missions, with companies working toward landers by 2028.[11][12][13][14][10]

    What happened to the VIPER rover?

    NASA had cancelled VIPER, but in September 2025 it gave Blue Origin a CLPS task order worth up to $190 million, with an option to land the rover near the lunar south pole in late 2027 on a second Blue Moon Mark 1 lander.[16]

    Sources

    · 16 claims from 1 publisher

    Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.

    1. [1]

      Through the Commercial Lunar Payload Services (CLPS) initiative, NASA buys delivery of its science, exploration and technology payloads to the Moon's surface and orbit from American companies. confirmedas of 2026-11-14

    2. [2]

      NASA's CLPS page says it has a pool of 13 eligible companies, has awarded 17 lunar deliveries to five vendors carrying more than 60 payloads, and that CLPS contracts have a combined maximum value of $2.6 billion through November 2028. confirmedas of 2026-11-14

    3. [3]

      Intuitive Machines' Nova-C lander launched on February 15, 2024 with six NASA payloads and landed on February 22, 2024, near Malapert A. confirmedas of 2026-11-14

    4. [4]

      Firefly Aerospace's Blue Ghost Mission 1 landed upright at 3:34 a.m. EST on March 2, 2025, near Mons Latreille in Mare Crisium, carrying 10 NASA instruments; it was Firefly's first Moon landing. confirmedas of 2026-11-14

    5. [5]

      Astrobotic's Peregrine lander, the first CLPS mission to launch, lifted off on January 8, 2024 with five NASA payloads but did not land on the Moon; it re-entered over the South Pacific on January 18. confirmedas of 2026-11-14

    6. [6]

      Intuitive Machines' IM-2 lander touched down at about 11:30 a.m. on March 6, 2025, more than 400 metres from its Mons Mouton target and on its side, so its NASA drill and instruments could not fully operate; it landed closer to the lunar south pole than any previous lander. confirmedas of 2026-11-14

    7. [7]

      Each CLPS award covers end-to-end delivery, including payload integration, mission operations, launch from Earth and landing on the Moon. confirmedas of 2026-11-14

    8. [8]

      NASA announced the first nine CLPS companies on November 29, 2018, and added five more, including Blue Origin, on November 18, 2019. confirmedas of 2026-11-14

    9. [9]

      NASA says it accepted that the commercial CLPS approach could produce some failures. confirmedas of 2026-11-14

    10. [10]

      In August 2026 NASA said Blue Origin, Firefly Aerospace, Intuitive Machines and Voyager were working toward delivering landers by 2028, and that phase I of its Moon Base plan, running through 2029, includes more than twenty robotic landings. confirmedas of 2026-08-04

    11. [11]

      As of August 2026, Voyager Technologies' Griffin-1 lander was planned to launch in late 2026 with five NASA payloads mounted on Astrolab's FLIP rover. confirmedas of 2026-08-04· forecast

    12. [12]

      As of August 2026, NASA said Firefly's Blue Ghost Mission 2 was planned to be the first American landing on the Moon's far side, carrying three NASA payloads. confirmedas of 2026-08-04

    13. [13]

      As of August 2026, Intuitive Machines' IM-3 mission, its third Nova-C landing, was to carry five NASA payloads to Reiner Gamma, a lunar swirl, alongside the Altus-1 data-relay satellite. confirmedas of 2026-08-04

    14. [14]

      In August 2026 NASA said Blue Origin's first Blue Moon Mark 1 lander, named Endurance, had completed an environmental test campaign including thermal-vacuum testing at NASA's Johnson Space Center and was progressing through integrated testing. confirmedas of 2026-08-04

    15. [15]

      Under CLPS task order CT-3, Blue Origin's Blue Moon Mark 1 lander is to deliver two NASA payloads, the SCALPSS descent cameras and a laser retroreflector array, to the lunar south pole. confirmedas of 2026-11-14

    16. [16]

      On September 19, 2025 NASA awarded Blue Origin a CLPS task order, CS-7, with a total potential value of $190 million and an option to deliver the VIPER rover, which NASA had previously cancelled, to the lunar south pole region in late 2027 on a second Blue Moon Mark 1 lander. confirmedas of 2026-11-14

    Revision history (1)
    1. Page created.

    Created Nov 14, 2026. Last reviewed by an editor on Nov 15, 2026. Next scheduled review: May 14, 2027.

    Cite this page

    "NASA's commercial Moon landers (CLPS) explained." ContentLora, updated Nov 14, 2026. https://contentlora.com/explain/commercial-lunar-payload-services

    Spotted an error? Suggest a correction or emailcorrections@contentlora.com.