    JT-60SA is a superconducting tokamak built jointly by Europe and Japan and hosted by QST in Naka, Japan. With a plasma volume of up to 160 cubic metres it is the world's largest operating tokamak, a title Fusion for Energy says it will hold until ITER runs.[1][2] It made its first, low-power plasmas at the end of 2023 and was then shut down for upgrades. Its next experimental campaign was expected to start at the end of 2026 and run for about six months.[3][4]

    Editor reviewedUpdated Wiki13 claims · 100% primaryFusion energy, Physics, Energy and climate
    Key facts

    What it is

    JT-60SA is a tokamak built jointly by Europe and Japan under the Broader Approach agreement. It is hosted by Japan’s National Institutes for Quantum Science and Technology (QST) in Naka.[1] The machine uses superconducting magnets. With a plasma volume of up to 160 cubic metres it is the world’s largest operating tokamak, a title Fusion for Energy (F4E) says it will hold until iter is running.[2] Its goal is to let scientists explore advanced fusion technologies and plasma physics, and test advanced plasma scenarios, to provide knowledge for ITER and future reactors.[5]

    The Broader Approach

    The EU-Japan Broader Approach agreement was signed in 2007. It funds three fusion research projects in Japan: JT-60SA, IFMIF/EVEDA and the International Fusion Energy Research Centre. F4E manages the EU contribution and QST manages Japan’s.[6] Japan is also an ITER member, one of six that share the costs Europe does not cover as host.[7]

    Design and construction

    The JT-60SA programme started in June 2007, and assembly of the tokamak was completed in March 2020. More than 500 researchers from Europe and Japan and more than 70 suppliers have contributed.[8] QST describes it as a low-aspect-ratio device, designed to balance a compact machine with a large plasma volume.[9] Its central solenoid uses niobium-tin superconductor and is 2 metres across, 6.4 metres high and 100 tonnes in weight. QST called it one of the world’s largest coils after ITER’s, and its 12-metre EF1 coil the world’s largest superconducting coil at the time.[10]

    First plasma and upgrades

    JT-60SA began low-power plasma operations at the end of 2023 and was switched off shortly afterwards.[3] During the roughly two-year shutdown, teams added European diagnostics and cryopumps and extra heating systems. They also fitted a new carbon-armoured first wall and divertor, and in-vessel coils that include two 8-metre ring coils for fast control of the plasma’s position.[11]

    Restart in 2026

    Integrated commissioning of the upgraded machine began in early 2026, with new equipment tested from 27 February. The next experimental campaign was expected to start at the end of 2026 and run for about six months.[4] F4E says the campaign will push JT-60SA to unprecedented plasma current, towards long-pulse and steady-state scenarios. More than 150 experiment proposals from Europe, Japan and the ITER Organization were under review.[12] The experiment team brings together more than 280 European and Japanese scientists.[13] Milestones across fusion research are followed in the fusion energy tracker.

    ITER

    ITER is the international fusion megaproject in southern France. Its goals, members, 2024 rebaseline to 2034 and 2039, and assembly progress in 2026.

    More in Fusion energy

    Questions readers ask

    Is JT-60SA bigger than ITER?

    No. JT-60SA is the world's largest operating tokamak, with a plasma volume of up to 160 cubic metres, but Fusion for Energy says it will hold that title only until ITER is up and running.[2]

    Who built JT-60SA?

    Europe and Japan built it under the Broader Approach agreement, signed in 2007. Fusion for Energy manages the EU contribution and Japan's QST manages Japan's and hosts the machine in Naka. More than 500 researchers and more than 70 suppliers have contributed.[1][6][8]

    What is JT-60SA for?

    It lets scientists explore advanced fusion technologies and plasma physics, and test advanced plasma scenarios, to provide knowledge for ITER and future reactors.[5]

    When will JT-60SA run again?

    Integrated commissioning of the upgraded machine began in early 2026. In March 2026 Fusion for Energy expected the next experimental campaign to start at the end of 2026 and run for about six months.[4]

    What was upgraded?

    The teams added European diagnostics and cryopumps, extra heating systems, a new carbon-armoured first wall and divertor, and in-vessel coils, including two 8-metre ring coils for fast control of the plasma's position.[11]

    Sources

    · 13 claims from 4 publishers

    Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.

    1. [1]

      JT-60SA is a tokamak built jointly by Europe and Japan under the Broader Approach agreement and hosted by Japan's National Institutes for Quantum Science and Technology (QST) in Naka, Japan. confirmedas of 2026-11-14

    2. [2]

      JT-60SA, which uses superconducting magnets, is the world's largest operating tokamak, with a plasma volume of up to 160 cubic metres; Fusion for Energy says it will hold that title until ITER is running. confirmedas of 2026-11-14

    3. [3]

      JT-60SA began low-power first plasma operations at the end of 2023 and was switched off shortly afterwards for upgrades. confirmedas of 2026-11-14

    4. [4]

      Integrated commissioning of the upgraded JT-60SA began in early 2026, with testing of new equipment from 27 February; the next experimental campaign was expected to start at the end of 2026 and run for about six months. confirmedas of 2026-05-15· forecast

    5. [5]

      JT-60SA's goal is to let scientists explore advanced fusion technologies and plasma physics, and test advanced plasma scenarios, to provide knowledge for ITER and future reactors. confirmedas of 2026-11-14

    6. [6]

      The EU-Japan Broader Approach agreement, signed in 2007, funds three fusion research projects in Japan, JT-60SA, IFMIF/EVEDA and the International Fusion Energy Research Centre; Fusion for Energy manages the EU contribution and QST manages Japan's. confirmedas of 2026-11-14

      • Broader Approach · Fusion for Energy (F4E) · Primary source (retrieved 2026-11-14)
      • Broader Approach · Fusion for Energy (F4E) · Primary source (retrieved 2026-11-14)
    7. [7]

      ITER is being built in Saint-Paul-lez-Durance in southern France; Europe, as host, pays almost half of construction costs and China, India, Japan, South Korea, Russia and the United States share the rest equally. confirmedas of 2026-10-10

    8. [8]

      The JT-60SA programme started in June 2007 and assembly of the tokamak was completed in March 2020; more than 500 researchers from Europe and Japan and more than 70 suppliers have contributed. confirmedas of 2026-11-14

      • JT-60SA Construction · National Institutes for Quantum Science and Technology (QST) · Primary source · 2020-12-22 (retrieved 2026-11-14)
      • JT-60SA Construction · National Institutes for Quantum Science and Technology (QST) · Primary source · 2020-12-22 (retrieved 2026-11-14)
      • Broader Approach · Fusion for Energy (F4E) · Primary source (retrieved 2026-11-14)
    9. [9]

      QST describes JT-60SA as a low-aspect-ratio device designed to balance a compact machine with a large plasma volume. confirmedas of 2020-12-22

      • JT-60SA Construction · National Institutes for Quantum Science and Technology (QST) · Primary source · 2020-12-22 (retrieved 2026-11-14)
    10. [10]

      JT-60SA's central solenoid uses niobium-tin superconductor and is 2 metres in diameter, 6.4 metres high and weighs 100 tonnes; QST described it as one of the world's largest coils after ITER's, and its 12-metre EF1 coil as the world's largest superconducting coil at the time of assembly. confirmedas of 2020-12-22

      • JT-60SA Construction · National Institutes for Quantum Science and Technology (QST) · Primary source · 2020-12-22 (retrieved 2026-11-14)
      • JT-60SA Construction · National Institutes for Quantum Science and Technology (QST) · Primary source · 2020-12-22 (retrieved 2026-11-14)
      • JT-60SA Construction · National Institutes for Quantum Science and Technology (QST) · Primary source · 2020-12-22 (retrieved 2026-11-14)
    11. [11]

      During the roughly two-year shutdown, teams added European diagnostics and cryopumps, extra heating systems, a new carbon-armoured first wall and divertor, and in-vessel coils including two 8-metre ring coils for fast plasma position control. confirmedas of 2026-03-13

    12. [12]

      Fusion for Energy says the next campaign will push JT-60SA to unprecedented plasma current, towards long-pulse and steady-state scenarios, and that more than 150 experiment proposals from Europe, Japan and the ITER Organization were under review. confirmedas of 2026-03-13

    13. [13]

      The JT-60SA experiment team brings together more than 280 European and Japanese scientists. confirmedas of 2025-01-28

    Revision history (1)
    1. Page created.

    Created Nov 14, 2026. Last reviewed by an editor on Nov 14, 2026. Next scheduled review: Feb 14, 2027.

    Cite this page

    "JT-60SA." ContentLora, updated Nov 14, 2026. https://contentlora.com/wiki/jt-60sa

    Spotted an error? Suggest a correction or emailcorrections@contentlora.com.