organization
Boeing
Also known as The Boeing Company, BA
Boeing is a US aerospace company, based in Arlington, Virginia, that reports three segments: Commercial Airplanes, Defense, Space & Security, and Global Services.[1][2] Since a door plug blew out of an Alaska Airlines 737-9 MAX in January 2024, the FAA has limited how fast Boeing can build 737s.[3][4] Boeing says it delivered 600 airplanes in 2025 and was moving 737 output from 42 to 47 a month in 2026 with the FAA's agreement.[5][6]
Key facts
Boeing is a US aerospace company. It was first incorporated in Washington state in 1916 and has its principal executive offices in Arlington, Virginia.[1] It reports three segments: Commercial Airplanes (BCA), Defense, Space & Security (BDS) and Global Services (BGS).[2] At the end of 2025 it had about 182,000 workers, 14% of them outside the United States.[7]
This page covers Boeing as a company: what it makes, how it is regulated, and its results. Financial and delivery figures come from Boeing’s own SEC filings and are self-reported. Safety findings are taken only from the FAA and NTSB. Individual executives appear only in their company roles.
What Boeing makes
Boeing’s commercial jets in production are the 737 narrow-body and the 767, 777 and 787 wide-bodies. At the start of 2026 the 777X and the 737-7 and 737-10 versions were still in development.[8] Boeing reported 2025 revenue of $89.5 billion. Commercial Airplanes contributed $41.5 billion, Defense, Space & Security $27.2 billion and Global Services $20.9 billion.[9] The US government, including foreign military sales, accounted for 35% of 2025 revenue.[10]
In defence, the US Navy selected Boeing in the third quarter of 2026 to design and build the F/A-XX next-generation fighter. Boeing has not yet added the order to its backlog, pending completion of the source-selection review.[11] BDS reported $7.9 billion of revenue that quarter and a record $101 billion backlog.[12] In December 2025 Boeing completed its acquisition of Spirit AeroSystems, a supplier whose production was also covered by the FAA’s 2024 audit.[13][14]
The 2024 door plug accident
On 5 January 2024 a mid-cabin door plug blew out of Alaska Airlines Flight 1282, a new 737-9 MAX, in flight. The FAA then grounded 171 737-9 MAX airplanes.[3] That month it also halted expansion of 737 MAX production.[4] In March 2024 the FAA said a six-week audit had found multiple instances where Boeing and Spirit AeroSystems allegedly failed to comply with manufacturing quality-control requirements.[14]
The NTSB’s investigation found that four bolts meant to hold the door plug in place were not located.[15] On 24 June 2025 the board said the probable cause was Boeing’s failure to provide adequate training, guidance and oversight to its factory workers. It also found that the FAA had been ineffective in making Boeing fix repeated problems with its parts-removal process.[16] The NTSB concluded that Boeing’s voluntary safety management system had been inadequate in the two years before the accident and lacked formal FAA oversight.[17]
Production under FAA oversight
In June 2025 the FAA said it would not lift the 737 monthly production cap until it was confident Boeing could keep up safety and quality while building more aircraft.[18] In May 2025 it renewed for three years Boeing’s Organization Designation Authorization, which lets a unit inside Boeing perform certain functions on the FAA’s behalf.[19] The FAA’s regulatory role is covered at federal-aviation-administration.
Boeing says 737 output rose from below 38 a month at the start of 2025 to 42 a month in the fourth quarter. The step came after the FAA and Boeing agreed in October 2025 that its performance indicators supported 42.[20] The FAA said its inspectors had reviewed the production lines extensively to make sure the small rate increase would be done safely.[21] In the second quarter of 2026 the 737 program began moving to 47 a month with FAA concurrence, and Boeing now expects to stabilise at that rate in 2027.[6] The 787 line is at eight a month, with the next increase planned for December 2026.[22]
Deliveries and recent results
Boeing delivered 600 commercial airplanes in 2025, including 447 737s, up from 348 in 2024 and 528 in 2023.[5] Production in 2024 was also hit by a 53-day strike by the IAM union that halted most commercial aircraft production. In 2025 a separate 101-day strike by about 3,200 IAM members at its St. Louis-area sites followed.[23]
For the third quarter of 2026, Boeing reported revenue of $24.2 billion and a net loss of $116 million, with operating cash flow of $1.5 billion.[24] It delivered 161 commercial airplanes in the quarter and 475 in the first nine months. Commercial backlog stood at over 6,300 airplanes worth $612 billion, and total backlog at a record $745 billion.[25] The 737-7 received amended FAA type certification during the quarter and the 737-10 in October; Boeing says the 777X remains on track for first delivery in 2027.[26]
Legal settlement over the 737 MAX crashes
According to Boeing’s 2025 annual report, on 29 May 2025 Boeing and the US Department of Justice entered a non-prosecution agreement to resolve the department’s determination that Boeing had not met its obligations under a 2021 deferred prosecution agreement relating to the 2018 Lion Air and 2019 Ethiopian Airlines 737 MAX accidents. The agreement requires a $244 million fine and $445 million of additional compensation for the families of those killed.[27] The same report says that on 6 November 2025 a federal court in Texas approved the department’s motion to dismiss the criminal case against Boeing, and that representatives of victims’ families appealed to the Fifth Circuit, where the appeal was pending when the report was filed on 30 January 2026.[28]
Read next
Next in the crash course
Airbus
Airbus, the European maker of the A220, A320, A330 and A350 airliners: its history, deliveries, backlog, 2026 results and production targets.
Questions readers ask
What does Boeing make?
Commercial jets (the 737 narrow-body and the 767, 777 and 787 wide-bodies, with the 777X in development), plus military aircraft, weapons and space systems through its Defense, Space & Security segment, and services through Global Services.[8][2]
Is the FAA still limiting 737 MAX production?
The FAA halted expansion of 737 MAX production in January 2024. In October 2025 the FAA and Boeing agreed that Boeing's performance indicators supported a rate of 42 a month, and in the second quarter of 2026 Boeing began moving to 47 a month with the FAA's concurrence.[4][20][6]
What caused the Alaska Airlines 1282 door plug blowout?
The NTSB found the probable cause was Boeing's failure to provide adequate training, guidance and oversight to its factory workers. Four bolts meant to secure the door plug were not located, and the NTSB found the FAA had been ineffective in ensuring Boeing addressed repeated problems with its parts-removal process.[16][15]
How many planes did Boeing deliver?
Boeing reported 600 commercial deliveries in 2025, up from 348 in 2024. In the first nine months of 2026 it delivered 475, including 161 in the third quarter.[5][25]
Is Boeing making money?
Not in the third quarter of 2026 on a net basis. Boeing reported a net loss of $116 million in the third quarter of 2026 on revenue of $24.2 billion, with $1.5 billion of operating cash flow. These are the company's own figures.[24]
Are the 737-7 and 737-10 certified?
Yes. Boeing says the 737-7 received amended type certification from the FAA in the third quarter of 2026 and the 737-10 in October 2026.[26]
Sources
· 28 claims from 3 publishers
Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.
- [1]
Boeing was originally incorporated in Washington state in 1916 and reincorporated in Delaware in 1934; its principal executive offices are in Arlington, Virginia. confirmedas of 2026-01-30
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 (retrieved 2026-11-07)
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 (retrieved 2026-11-07)
- [2]
Boeing reports three segments - Commercial Airplanes (BCA), Defense, Space & Security (BDS) and Global Services (BGS). confirmedas of 2026-01-30
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 (retrieved 2026-11-07)
- [3]
After a mid-cabin door plug blew out of Alaska Airlines Flight 1282, a new Boeing 737-9 MAX, in flight on 5 January 2024, the FAA grounded 171 Boeing 737-9 MAX airplanes. confirmedas of 2026-11-07
- Updates on Boeing 737-9 MAX Aircraft · Federal Aviation Administration · Primary source (retrieved 2026-11-07)
- Updates on Boeing 737-9 MAX Aircraft · Federal Aviation Administration · Primary source (retrieved 2026-11-07)
- [4]
In January 2024 the FAA halted production expansion of the Boeing 737 MAX. confirmedas of 2026-11-07
- Updates on Boeing 737-9 MAX Aircraft · Federal Aviation Administration · Primary source (retrieved 2026-11-07)
- [5]
Boeing delivered 600 commercial airplanes in 2025 (including 447 737s and 88 787s), up from 348 in 2024 and 528 in 2023. confirmedas of 2025-12-31
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 · BCA deliveries table (737, 747, 767, 777, 787, Total): 2025 = 447, -, 30, 35, 88, 600; 2024 total 348; 2023 total 528 (retrieved 2026-11-07)
- [6]
Boeing says its 737 program began moving from 42 to 47 airplanes a month in the second quarter of 2026 with the FAA's concurrence, and it now expects to stabilise at 47 a month in 2027. confirmedas of 2026-10-27· forecast
- The Boeing Company Form 10-Q for the quarter ended September 30, 2026 · Boeing (SEC filing) · Primary source · 2026-10-27 (retrieved 2026-11-07)
- The Boeing Company Form 10-Q for the quarter ended September 30, 2026 · Boeing (SEC filing) · Primary source · 2026-10-27 (retrieved 2026-11-07)
- [7]
Boeing's workforce was about 182,000 at the end of 2025, 14% of it outside the US, and about 72,000 employees (40%) were union-represented. confirmedas of 2025-12-31
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 (retrieved 2026-11-07)
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 (retrieved 2026-11-07)
- [8]
Boeing's commercial jets in production are the 737 narrow-body and the 767, 777 and 787 wide-bodies; the 777X and the 737-7 and 737-10 derivatives were still in development at the start of 2026. confirmedas of 2026-01-30
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 (retrieved 2026-11-07)
- [9]
Boeing reported 2025 revenue of $89.5 billion ($89,463 million), up from $66.5 billion in 2024; Commercial Airplanes contributed $41.5 billion, Defense, Space & Security $27.2 billion and Global Services $20.9 billion. confirmedas of 2025-12-31
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 · Consolidated Statements of Operations; segment table: Commercial Airplanes $ 41,494, Defense, Space & Security 27,234, Global Services 20,923 (retrieved 2026-11-07)
- [11]
In the third quarter of 2026 the US Navy selected Boeing to design, build and deliver the F/A-XX next-generation fighter; Boeing has not added the order to backlog pending completion of the source selection and evaluation review. confirmedas of 2026-10-27
- Boeing Reports Third Quarter Results (Form 8-K, Exhibit 99.1) · Boeing (SEC filing) · Primary source · 2026-10-27 · Defense, Space & Security section (retrieved 2026-11-07)
- [12]
Boeing's Defense, Space & Security revenue was $7.9 billion in the third quarter of 2026, with a 6.2% operating margin that included a $252 million gain on the sale of HRL Laboratories; segment backlog was a record $101 billion. confirmedas of 2026-09-30
- Boeing Reports Third Quarter Results (Form 8-K, Exhibit 99.1) · Boeing (SEC filing) · Primary source · 2026-10-27 · Segment results; the cached copy keeps the ampersand as an HTML entity. Margin 6.2 percent including a $252 million gain on the HRL Laboratories sale; backlog record $101 billion (retrieved 2026-11-07)
- [13]
Boeing completed its acquisition of Spirit AeroSystems Holdings on 8 December 2025. confirmedas of 2026-10-27
- The Boeing Company Form 10-Q for the quarter ended September 30, 2026 · Boeing (SEC filing) · Primary source · 2026-10-27 (retrieved 2026-11-07)
- [14]
The FAA said in March 2024 that its six-week audit of Boeing and Spirit AeroSystems found multiple instances where the companies allegedly failed to comply with manufacturing quality-control requirements. confirmedas of 2024-03-04
- Updates on Boeing 737-9 MAX Aircraft · Federal Aviation Administration · Primary source (retrieved 2026-11-07)
- [15]
The NTSB found that four bolts meant to stop the left mid-exit door plug from moving upward were not located. confirmedas of 2025-06-24
- In-Flight Mid Exit Door Plug Separation, Alaska Airlines Flight 1282, Boeing 737-9, N704AL · National Transportation Safety Board · Primary source (retrieved 2026-11-07)
- [16]
On 24 June 2025 the NTSB said the probable cause of the Alaska Airlines 1282 door-plug blowout was Boeing's failure to provide adequate training, guidance and oversight to its factory workers, and found the FAA had been ineffective in ensuring Boeing addressed repetitive and systemic nonconformance issues with its parts-removal process. confirmedas of 2025-06-24
- Boeing's Inadequate 'Training, Guidance and Oversight' Led to Mid-Exit Door Plug Blowout on Passenger Jet · National Transportation Safety Board · Primary source · 2025-06-24 (retrieved 2026-11-07)
- Boeing's Inadequate 'Training, Guidance and Oversight' Led to Mid-Exit Door Plug Blowout on Passenger Jet · National Transportation Safety Board · Primary source · 2025-06-24 (retrieved 2026-11-07)
- [17]
The NTSB also concluded that in the two years before the accident Boeing's voluntary safety management system was inadequate and lacked formal FAA oversight. confirmedas of 2025-06-24
- Boeing's Inadequate 'Training, Guidance and Oversight' Led to Mid-Exit Door Plug Blowout on Passenger Jet · National Transportation Safety Board · Primary source · 2025-06-24 (retrieved 2026-11-07)
- [18]
In June 2025 the FAA said it would not lift the 737 monthly production cap until it was confident Boeing could maintain safety and quality while making more aircraft. confirmedas of 2025-06-24
- General Statements · Federal Aviation Administration · Primary source (retrieved 2026-11-07)
- [19]
In May 2025 the FAA renewed Boeing's Organization Designation Authorization, which lets an independent unit within Boeing perform certain functions on the FAA's behalf, for three years from 1 June 2025. confirmedas of 2025-05-29
- General Statements · Federal Aviation Administration · Primary source (retrieved 2026-11-07)
- General Statements · Federal Aviation Administration · Primary source (retrieved 2026-11-07)
- [20]
Boeing says 737 production recovered from below 38 aircraft a month at the start of 2025 to 42 a month in the fourth quarter, after the FAA and Boeing agreed in October 2025 that the company's performance indicators supported an increase to 42. confirmedas of 2026-01-30
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 (retrieved 2026-11-07)
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 (retrieved 2026-11-07)
- [21]
On 17 October 2025 the FAA said its safety inspectors had conducted extensive reviews of Boeing's production lines to ensure that a small production rate increase would be done safely. confirmedas of 2025-10-17
- General Statements · Federal Aviation Administration · Primary source (retrieved 2026-11-07)
- [22]
Boeing says 787 production has stabilised at eight a month, and in the third quarter of 2026 it delayed planned increases, with the next step planned for December 2026. confirmedas of 2026-10-27· forecast
- The Boeing Company Form 10-Q for the quarter ended September 30, 2026 · Boeing (SEC filing) · Primary source · 2026-10-27 (retrieved 2026-11-07)
- The Boeing Company Form 10-Q for the quarter ended September 30, 2026 · Boeing (SEC filing) · Primary source · 2026-10-27 (retrieved 2026-11-07)
- [23]
A 53-day strike in 2024 by IAM District 751, which represents over 30,000 Boeing manufacturing employees mainly in Washington state, halted most commercial aircraft production; in 2025 about 3,200 IAM District 837 members at St. Louis-area sites struck for 101 days. confirmedas of 2026-01-30
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 (retrieved 2026-11-07)
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 (retrieved 2026-11-07)
- [24]
Boeing reported third-quarter 2026 revenue of $24.2 billion and a net loss of $116 million (a GAAP loss of $0.26 per share), with operating cash flow of $1.5 billion. confirmedas of 2026-10-27
- Boeing Reports Third Quarter Results (Form 8-K, Exhibit 99.1) · Boeing (SEC filing) · Primary source · 2026-10-27 · Table 1: Net loss ($116) million; diluted loss per share ($0.26); operating cash flow $1,496 million (retrieved 2026-11-07)
- [25]
Boeing delivered 161 commercial airplanes in the third quarter of 2026 and 475 in the first nine months; its commercial backlog included over 6,300 airplanes valued at $612 billion, and total company backlog reached a record $745 billion. confirmedas of 2026-09-30
- Boeing Reports Third Quarter Results (Form 8-K, Exhibit 99.1) · Boeing (SEC filing) · Primary source · 2026-10-27 (retrieved 2026-11-07)
- Boeing Reports Third Quarter Results (Form 8-K, Exhibit 99.1) · Boeing (SEC filing) · Primary source · 2026-10-27 · Table 4 also gives nine-month deliveries of 475 (retrieved 2026-11-07)
- [26]
The 737-7 received amended type certification from the FAA in the third quarter of 2026 and the 737-10 in October 2026; Boeing says the 777X remains on track for first delivery in 2027. confirmedas of 2026-10-27
- Boeing Reports Third Quarter Results (Form 8-K, Exhibit 99.1) · Boeing (SEC filing) · Primary source · 2026-10-27 (retrieved 2026-11-07)
- Boeing Reports Third Quarter Results (Form 8-K, Exhibit 99.1) · Boeing (SEC filing) · Primary source · 2026-10-27 (retrieved 2026-11-07)
- [27]
On 29 May 2025 Boeing and the US Department of Justice entered a non-prosecution agreement resolving the department's determination that Boeing had not met its obligations under a January 2021 deferred prosecution agreement relating to the 2018 Lion Air and 2019 Ethiopian Airlines 737 MAX accidents; it requires a $244 million fine and $445 million of additional compensation for the victims' families. confirmedas of 2026-01-30
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 (retrieved 2026-11-07)
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 · Note 23: fine of $ 244 and $ 445 of additional compensation (millions) (retrieved 2026-11-07)
- [28]
According to Boeing's 2025 annual report, on 6 November 2025 the US District Court for the Northern District of Texas approved the Justice Department's motion to dismiss the criminal information against Boeing; representatives of victims' family members appealed, and the appeal was pending before the Fifth Circuit as of the report's filing on 30 January 2026. confirmedas of 2026-01-30
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 · Note 23 (the Motion is the Department's motion to dismiss the criminal information against Boeing) (retrieved 2026-11-07)
- The Boeing Company Form 10-K for the fiscal year ended December 31, 2025 · Boeing (SEC filing) · Primary source · 2026-01-30 · Note 23 (retrieved 2026-11-07)
Revision history (2)
- Added the November 2025 court approval of the Justice Department's dismissal motion and the families' pending appeal.
- Page created.
Created Nov 7, 2026. Last reviewed by an editor on Nov 8, 2026. Next scheduled review: Feb 5, 2027.
Cite this page
"Boeing." ContentLora, updated Nov 14, 2026. https://contentlora.com/wiki/boeing