BEST: China's Burning Plasma Experimental Superconducting Tokamak
Also known as BEST, Burning Plasma Experimental Superconducting Tokamak
BEST, the Burning Plasma Experimental Superconducting Tokamak, is a compact fusion device under construction in Hefei, China, led by the Chinese Academy of Sciences' Institute of Plasma Physics (ASIPP).[1] It is designed to burn deuterium-tritium plasma; its builders say it should be finished by the end of 2027 and aim to show net fusion power gain and fusion electricity by around 2030.[2][3][4]
Key facts
What it is
BEST, the Burning Plasma Experimental Superconducting Tokamak, is a compact fusion experiment under construction in Hefei, Anhui Province. The project is led by the Institute of Plasma Physics (ASIPP) at the Chinese Academy of Sciences’ Hefei Institutes of Physical Science.[1] Nuclear Engineering International describes a compact high-field superconducting tokamak with high-performance superconducting magnets, high-power neutral-beam heating and deuterium-tritium fuel.[5]
ASIPP says that, unlike previous fusion experimental devices, BEST is designed to demonstrate the actual burning of deuterium-tritium plasma.[2] Earlier machines such as EAST are scientific experiments whose own researchers say a significant gap remains to a commercial reactor.[6] Nuclear Engineering International, in a report drawing on Chinese state media, describes BEST as an intermediate phase between EAST and a future China Fusion Engineering Demo Reactor (CFEDR).[7]
Goals
The Chinese Academy of Sciences says BEST is designed to achieve net fusion power gain and to demonstrate fusion electricity generation by around 2030.[4] ASIPP describes the aim as the world’s first electricity generation from fusion power.[1] Nuclear Engineering International, in the same report, gives a target of a five-fold energy gain.[7] On the Q scale, EUROfusion calls a plasma with Q above 1 a burning plasma; ITER‘s main goal is Q of at least 10.[8][9]
The completion date and the 2030 and gain targets are the builders’ own goals, reported through the Chinese Academy of Sciences and state media. No independent schedule review was found.
Construction milestones
- May 2025. Full-scale assembly of the machine began.[10]
- 28 September to 1 October 2025. The first key component, the Dewar base, was installed.[11] It weighs over 400 tonnes, is about 18 metres across and 5 metres high, and is the heaviest single part of the main machine.[11] The Dewar acts like a giant high-vacuum thermos flask. It insulates superconducting magnets that must run at minus 269 degrees Celsius to confine plasma heated above 100 million degrees.[12]
- January 2026. At the Fusion Energy Technology and Industry Conference in Hefei, the 2030 target was restated. Xinhua reported plans for a “Fusion City” science and industry zone in Hefei’s Changfeng County.[4][13]
- End of 2027. Scheduled completion of the device, according to ASIPP.[3]
Where it fits
Other machines aiming at gain above 1 include Commonwealth Fusion Systems’ SPARC in the US, which its builder targets for 2027, and ITER in France, whose main goal is Q of at least 10.[14][9] Long-pulse work continues on EAST in Hefei and on South Korea’s KSTAR.[15][16] Progress is followed in the fusion energy tracker.
Read next
Next in the crash course
DOE Milestone-Based Fusion Development Program
How the US Energy Department's milestone fusion program pays private companies only for verified progress toward pilot plants, and who the eight awardees are.
More in Fusion energy
Questions readers ask
What is BEST meant to do?
It is designed to demonstrate the actual burning of deuterium-tritium plasma, achieve net fusion power gain and demonstrate fusion electricity generation by around 2030, according to the Chinese Academy of Sciences.[2][4]
When will BEST be finished?
ASIPP said in October 2025 that the device is scheduled for completion by the end of 2027. That is the builder's own schedule.[3]
How is BEST different from EAST?
EAST, also in Hefei, is a scientific experimental tokamak that has set long-pulse records. ASIPP says that, unlike previous fusion experimental devices, BEST is designed to demonstrate the actual burning of deuterium-tritium plasma, and trade press describes it as an intermediate step between EAST and a planned demonstration reactor.[6][15][2][7]
Sources
· 16 claims from 8 publishers
Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.
- [1]
The Burning Plasma Experimental Superconducting Tokamak (BEST) is a compact fusion experiment under construction in Hefei, led by the Institute of Plasma Physics (ASIPP) of the Chinese Academy of Sciences' Hefei Institutes of Physical Science, which says it aims at the world's first electricity generation from fusion power. confirmedas of 2025-10-09
- Compact Fusion Device Reaches Milestone with Installation of Key Component · Hefei Institutes of Physical Science, Chinese Academy of Sciences · Primary source · 2025-10-09 (retrieved 2026-11-21)
- Compact Fusion Device Reaches Milestone with Installation of Key Component · Hefei Institutes of Physical Science, Chinese Academy of Sciences · Primary source · 2025-10-09 (retrieved 2026-11-21)
- Key Component Installed in China's Compact Fusion Device, BEST · Chinese Academy of Sciences · Primary source · 2025-10-10 (retrieved 2026-11-21)
- [2]
ASIPP says that, unlike previous fusion experimental devices, BEST is designed to demonstrate the actual burning of deuterium-tritium plasma. confirmedas of 2025-10-09
- Compact Fusion Device Reaches Milestone with Installation of Key Component · Hefei Institutes of Physical Science, Chinese Academy of Sciences · Primary source · 2025-10-09 (retrieved 2026-11-21)
- [3]
ASIPP said in October 2025 that the BEST device is scheduled for completion by the end of 2027. reportedas of 2025-10-09· forecast
- Compact Fusion Device Reaches Milestone with Installation of Key Component · Hefei Institutes of Physical Science, Chinese Academy of Sciences · Primary source · 2025-10-09 (retrieved 2026-11-21)
- Key Component Installed in China's Compact Fusion Device, BEST · Chinese Academy of Sciences · Primary source · 2025-10-10 (retrieved 2026-11-21)
- [4]
China's Burning Plasma Experimental Superconducting Tokamak (BEST), under construction in Hefei, is designed to burn deuterium-tritium plasma, achieve net fusion power gain and demonstrate fusion electricity generation by around 2030, according to the Chinese Academy of Sciences. confirmedas of 2026-01-19· forecast
- China accelerates nuclear fusion engineering, targeting power generation demonstration by 2030 · Chinese Academy of Sciences · Primary source · 2026-01-19 (retrieved 2026-10-10)
- Burning Plasma Experimental Superconducting Tokamak under construction in Hefei, China's Anhui · Chinese Academy of Sciences · Primary source · 2026-04-17 (retrieved 2026-10-10)
- [5]
Nuclear Engineering International describes BEST as a burning-plasma physics facility using compact high-field superconducting tokamak technology, high-performance superconducting magnets, high-power neutral-beam heating and deuterium-tritium fuel. reportedas of 2025-10-09
- China begins installing BEST fusion reactor · Nuclear Engineering International · Secondary source (retrieved 2026-11-21)
- [6]
The head of EAST physics and experimental operations told China Daily that EAST is a scientific experimental device, that the ultimate goal is a commercially viable fusion reactor, and that a significant gap remains between EAST and future fusion devices. reportedas of 2025-01-21
- China's artificial sun sets new world record · China Daily · Secondary source · 2025-01-21 (retrieved 2026-11-21)
- China's artificial sun sets new world record · China Daily · Secondary source · 2025-01-21 (retrieved 2026-11-21)
- [7]
According to Nuclear Engineering International, citing Chinese state media, BEST aims for a five-fold energy gain and sits between EAST and the planned China Fusion Engineering Demo Reactor (CFEDR). reportedas of 2026-11-21· forecast
- Final assembly for Chinese tokamak · Nuclear Engineering International · Secondary source (retrieved 2026-11-21)
- Final assembly for Chinese tokamak · Nuclear Engineering International · Secondary source (retrieved 2026-11-21)
- [8]
Energy breakeven occurs when the energy released by fusion equals the energy put in to heat the plasma, which corresponds to Q of 1; a burning plasma has Q above 1, and ignition corresponds to Q of infinity. confirmedas of 2026-11-21
- Glossary: Breakeven · EUROfusion · Primary source (retrieved 2026-11-21)
- Glossary: Breakeven · EUROfusion · Primary source (retrieved 2026-11-21)
- Glossary: Breakeven · EUROfusion · Primary source (retrieved 2026-11-21)
- Glossary: Breakeven · EUROfusion · Primary source (retrieved 2026-11-21)
- [9]
ITER is designed to demonstrate the scientific and technological feasibility of fusion power and will be the world's largest experimental fusion facility; its mission goals are to demonstrate integration of systems for industrial-scale fusion, reach Q of at least 10, and eventually reach Q of at least 5 in steady state. confirmedas of 2026-10-10
- Press conference summary: updated ITER baseline (presentation by the Director-General) · ITER Organization · Primary source · 2024-07-03 (retrieved 2026-10-10)
- Press conference summary: updated ITER baseline (presentation by the Director-General) · ITER Organization · Primary source · 2024-07-03 (retrieved 2026-10-10)
- Press conference summary: updated ITER baseline (presentation by the Director-General) · ITER Organization · Primary source · 2024-07-03 (retrieved 2026-10-10)
- [10]
Full-scale assembly of BEST began in May 2025. confirmedas of 2025-10-09
- Compact Fusion Device Reaches Milestone with Installation of Key Component · Hefei Institutes of Physical Science, Chinese Academy of Sciences · Primary source · 2025-10-09 (retrieved 2026-11-21)
- China begins installing BEST fusion reactor · Nuclear Engineering International · Secondary source (retrieved 2026-11-21)
- [11]
Between 28 September and 1 October 2025 BEST's first key component, the Dewar base, was installed; it weighs over 400 tonnes, measures about 18 metres across and 5 metres high, and is the heaviest single component of the main machine. confirmedas of 2025-10-09
- Compact Fusion Device Reaches Milestone with Installation of Key Component · Hefei Institutes of Physical Science, Chinese Academy of Sciences · Primary source · 2025-10-09 (retrieved 2026-11-21)
- Compact Fusion Device Reaches Milestone with Installation of Key Component · Hefei Institutes of Physical Science, Chinese Academy of Sciences · Primary source · 2025-10-09 (retrieved 2026-11-21)
- Key Component Installed in China's Compact Fusion Device, BEST · Chinese Academy of Sciences · Primary source · 2025-10-10 (retrieved 2026-11-21)
- [12]
BEST's Dewar works like a giant high-vacuum thermos flask, insulating superconducting magnets that must run at minus 269 degrees Celsius to confine plasma heated to over 100 million degrees. confirmedas of 2025-10-09
- Compact Fusion Device Reaches Milestone with Installation of Key Component · Hefei Institutes of Physical Science, Chinese Academy of Sciences · Primary source · 2025-10-09 (retrieved 2026-11-21)
- [13]
At the Fusion Energy Technology and Industry Conference 2026 in Hefei in January 2026, organisers also announced plans for a "Fusion City" demonstration zone in Changfeng County, Hefei, according to Xinhua. reportedas of 2026-01-19
- China accelerates nuclear fusion engineering, targeting power generation demonstration by 2030 · Chinese Academy of Sciences · Primary source · 2026-01-19 (retrieved 2026-10-10)
- [14]
As of October 2026 Commonwealth Fusion Systems publicly targets 2027 for SPARC to produce more energy from fusion than is needed to power the process, the Q>1 threshold. reportedas of 2026-10-10· forecast
- SPARC: Proving commercial fusion energy is possible · Commonwealth Fusion Systems · Primary source (retrieved 2026-10-10)
- [15]
On 20 January 2025 China's EAST tokamak sustained a high-confinement plasma for 1,066 seconds, the first to pass 1,000 seconds, at nearly 70 million degrees Celsius. confirmedas of 2026-10-10
- Achievements at EAST and WEST · ITER Organization · Primary source (retrieved 2026-10-10)
- [16]
In its December 2023 to February 2024 campaign, KSTAR sustained plasma with ion temperatures of 100 million degrees Celsius for 48 seconds and held high-confinement mode (H-mode) for 102 seconds, KFE announced. confirmedas of 2024-03-28
- Green light on continuous fusion plasma operations technology · National Research Council of Science & Technology / Korea Institute of Fusion Energy (EurekAlert! press release) · Primary source · 2024-03-28 (retrieved 2026-11-21)
- Green light on continuous fusion plasma operations technology · National Research Council of Science & Technology / Korea Institute of Fusion Energy (EurekAlert! press release) · Primary source · 2024-03-28 (retrieved 2026-11-21)
- Another record for South Korea's KSTAR · Nuclear Engineering International · Secondary source · 2024-04-02 (retrieved 2026-11-21)
Revision history (1)
- Page created.
Created Nov 21, 2026. Last reviewed by an editor on Nov 22, 2026. Next scheduled review: Mar 8, 2027.
Cite this page
"BEST: China's Burning Plasma Experimental Superconducting Tokamak." ContentLora, updated Nov 21, 2026. https://contentlora.com/wiki/best-tokamak
Spotted an error? Suggest a correction or emailcorrections@contentlora.com.